Production Tracker — WO-0005

Production Tracker — WO-0005

Order: WO-0005 Product: Floor Plan Optimizer - Residential Layout Permutation Tool Client: Bruno Bock (internal — dogfooding) Created: 2026-03-28 Production Line: digital-talent


Pipeline Status

Stage Name Owner Status Started Completed Gate
1 Intake Camille complete 2026-03-28 2026-03-28 PASS
2 Requirements & Design Pablo complete 2026-03-29 2026-03-29 PASS
3 Pattern Selection Ada skipped
4 Assembly / Build Pablo ready 2026-03-30
5 Quality Gate (QA) Quinn pending
6 Deployment & Packaging Diego pending
7 Client Delivery & UAT Dana pending
8 Billing & Support CEO pending
9 Feedback Loop Fiona pending

Current Stage

Stage: 4 — Assembly / Build Owner: Pablo (Production Line Architect) Next action: Execute 9 build tasks per stage-2-solution-spec.md§5. Start with Task 1 (audit prototype) then Task 2 (permutation model refactor — critical path). Blockers: none


Stage Log

Stage 1 — Intake

  • Started: 2026-03-28
  • Completed: 2026-03-28
  • Gate: PASS
  • Notes: First dogfooding order. Dual objective: deliver the tool AND validate the 9-stage pipeline. All source data available in Architecture Maison project. Intake type: Type 1 (new product, new client).
  • Handoff to: Pablo (Stage 2)

Stage 2 — Requirements & Design

  • Started: 2026-03-29
  • Completed: 2026-03-29
  • Gate: PASS
  • Notes: Solution spec written (stage-2-solution-spec.md). Architecture confirmed: single-file HTML, HTML5 Canvas, plain JS. Permutation model resolved — type-assignment to pre-drawn zones (not positional swap). Web Worker recommended for N>6 movable zones. Prototype v3.1 exists; 5 gaps identified, all addressable. 9 build tasks sequenced for Stage 4. Gate checklist: PASS.
  • Handoff to: Ada (Stage 3 — likely pass-through), then Pablo (Stage 4)

Stage 3 — Pattern Selection

  • Started:
  • Completed:
  • Gate:
  • Notes: Standalone HTML tool — no agentic patterns to select. Confirmed pass-through per Stage 2 spec.
  • Status: skipped
  • Handoff to: Pablo (Stage 4)

Stage 4 — Assembly / Build

  • Started: 2026-03-30
  • Completed:
  • Gate:
  • Notes: SIPOC + Request Card produced. Stage 2 spec complete. Build from prototype v3.1. 9 tasks sequenced in stage-2-solution-spec.md.
  • Handoff to:

Stage 5 — Quality Gate (QA)

  • Started:
  • Completed:
  • Gate:
  • Notes:
  • Handoff to:

Stage 6 — Deployment & Packaging

  • Started:
  • Completed:
  • Gate:
  • Notes:
  • Handoff to:

Stage 7 — Client Delivery & UAT

  • Started:
  • Completed:
  • Gate:
  • UAT verdict:
  • Notes: Client is the CEO (internal). UAT = CEO walks through 6 acceptance criteria from work order.
  • Handoff to:

Stage 8 — Billing & Support

  • Started:
  • Completed:
  • Gate:
  • Notes: Internal order — billing may be N/A or tracked as internal cost allocation.

Stage 9 — Feedback Loop

  • Started:
  • 30-day checkpoint:
  • 60-day checkpoint:
  • 90-day checkpoint:
  • Notes: Success criteria: CEO uses tool to explore 3+ layout variations for actual house project within 30 days.