Production Lines
Stage 4 Complete — Build
Stage 4 Complete — Build
Date: 2026-03-18 Worker: Pablo (Production Line Architect) Order: WO-001 Product: Agent EA STM
Deliverables
| Deliverable | Location |
|---|---|
| Complete agent repository | C:/Projects/agent-ea/ |
| Assembly checklist (filled) | production-lines/orders/stm-ea-agent/assembly-checklist.md |
| Build plan | production-lines/orders/stm-ea-agent/stage-4-build-plan.md |
| Client documentation (4 files) | C:/Projects/agent-ea/docs/ |
Gate Criteria
- All phases A-H complete
- All files present (16 skills, 9 templates, 8+ references, 4 docs)
- CLAUDE.md consistent with .claude/commands/ (16/16 match)
- Naming conventions consistent
- Smoke tests passed (3 representative skills)
- E2E orchestrator test passed
- Dev artifacts archived to
_dev-archive/ - Factory-internal references removed
- Documentation complete in French Canadian
Notes for Quinn (Stage 5)
Test Data
- Sample meeting notes for
/ea-exigences-note-revueavailable in existingdemandes-ae/requests - LeanIX CSV data for
/ea-qualite-validationand/ea-archi-extractionin existing requests - Draw.io template tests can use any intrant file as input
Known Considerations
ea-archi-extractionis an additional skill (not in original WO spec) — added during build as it's a legitimate EA capability. Test it.- The
_dev-archive/directory contains archived dev tools — should NOT be included in packaging (Stage 6) - Binary reference files (.jpg, .doc, .pdf) in
content-in/may not be directly readable by the agent — markdown references exist alongside them .mcp.jsonrequiresdrawio-mcpnpm package in the client environment
Recommended Test Order
- Test skills in isolation first (requirements → analysis → solution → quality → common)
- Then test the HLSD orchestrator pipeline end-to-end
- Pay attention to quality gate halt points and state detection