Stage 7: Client Delivery and Handoff
Stage 7: Client Delivery and Handoff
Owner: Dana (Delivery Manager) Blueprint stage: Stage 7 -- Client Delivery and Handoff
Trigger
Deployment verified by Diego (Stage 6 gate passed).
Inputs
| Source | What |
|---|---|
| Diego (Stage 6) | Deployment manifest and verification log |
| Pablo (Stage 4/G) | Client documentation (user guide, config guide, skill reference) |
| Camille (Stage 1) | Client contact information and stakeholder map |
| Work order | Demo scenarios, product-specific feedback questions |
Activities
7.1 Schedule Handover Session
Schedule 1-2 hour session. Identify attendees (users, technical leads, admin). Prepare agenda and demo scenarios relevant to the product type. Consult the work order for recommended demo scenarios. If the work order doesn't specify, demo three skills representing: intake/input processing, core analysis/generation capability, and output/publication.
7.2 Conduct Handover Session
- What the talent does -- overview of capabilities (10 min)
- How to start a new request -- create request folder, provide inputs (15 min)
- Live demo: run 3 skills -- demonstrate core capabilities (30 min)
- End-to-end workflow -- orchestrator demo if applicable (15 min)
- Configuration and customization -- updating templates, adding references (10 min)
- Q&A -- address client questions (20 min)
7.3 Customer Acceptance Testing (UAT)
After the handover demo, the customer formally tests the product against the acceptance criteria defined in the work order. This is the customer's opportunity to verify the product meets their needs before signing off.
Process:
- Dana provides the customer with a copy of the work order's acceptance criteria
- Customer walks through each criterion, testing independently (with support available)
- Customer marks each criterion: PASS / FAIL / N/A
- Customer provides an overall verdict:
| Verdict | Meaning | Next Step |
|---|---|---|
| ACCEPT | All criteria met or minor cosmetic issues only | Proceed to 7.4 (sign-off) |
| CONDITIONAL | Minor issues exist but product is usable | Delivery proceeds; fix plan agreed with deadline. Pablo implements fixes. |
| REJECT | Blocking issues prevent acceptance | Loops back to Pablo (N-046). Re-enters at Stage 4 or 5 depending on severity. |
Remediation on REJECT:
- Dana documents specific failures and routes to Pablo
- Pablo fixes and re-submits through QA (Stage 5) if structural, or directly back to UAT if cosmetic
- Max 2 rejection cycles before escalation to Clara (CTO)
- Iteration count tracked in
process/uat-results.md
Template: workflows/templates/uat-results-template.md
7.4 Deliver Documentation
User guide (client language), configuration guide, skill reference card, quick-start cheat sheet.
7.5 Confirm Client Operational Capability
Client demonstrates invoking 3+ skills independently. Client creates a new request correctly. Client understands any halt/approval checkpoints.
7.6 Establish Feedback Channel
Dana explains how the customer can submit feedback, bugs, and feature requests post-delivery:
- Repo-based products:
feedback/folder in the deployed repo — one file per issue using the feedback template - Standalone products: Shared delivery folder (e.g., OneDrive/agents/{client}/feedback/) or email
- Dana confirms the customer knows the channel and has submitted a test entry
7.7 Collect Initial Feedback
First impressions, missing capabilities, usability issues, confidence level (1-5). Supplement generic feedback questions with product-specific questions from the work order (look for a feedback questions section, typically Section 12 or equivalent).
Outputs
| Deliverable | Format | Destination |
|---|---|---|
| UAT results | Markdown | Filed in order process/ |
| Delivery confirmation | Markdown (signed by client) | Triggers billing (Stage 8) |
| Handover session notes | Markdown | Filed in order records |
| Initial client feedback | Markdown | Sent to Fiona (Stage 9) |
Quality Gate
Gate: Client accepts product (UAT ACCEPT or CONDITIONAL) and confirms operational capability. Criteria: UAT completed, handover completed, client demonstrated independent use, documentation delivered, feedback channel established, confirmation signed. Evidence: UAT results + signed delivery confirmation + handover notes.